House renovation where the temporary wall is covered with shrink wrap.
Project

Covering Temporary Wall with Shrink Wrap

In this project, an existing wall was fitted with a temporary wall that would remain unprotected for an extended period. Without measures, the wall could be exposed to rain, snow, wind, and UV radiation for months, with a high risk of moisture infiltration and damage. Moreover, construction against the wall meant that concrete water could also affect the wall during the pouring of floors and slabs.

Challenge

  • Moisture and dirt that would penetrate through the temporary wall.
  • Risk of discoloration and damage from UV during a long construction period.
  • Risk of concrete water seepage during adjacent works.
  • Project in an environment where additional fire safety was required.

Our Approach

Our team tightly wrapped the entire temporary wall with professional shrink wrap. We chose NVO (non-flame sustaining) film, ensuring the facade was not only protected against weather conditions but also met safety standards for public spaces.

  • The film was applied on-site and carefully tensioned.
  • All seams and connections were sealed airtight.
  • Thanks to the shrink technology, the wall received a tight and durable covering that lasts at least one year.

Result

  • The wall remains completely dry and protected throughout the construction phase.
  • No risk of seeping concrete water or rain.
  • A fire-safe solution that meets the client’s requirements.
  • The facade also looks neatly finished, which is important for construction sites in public view.